Reported risk: THE POWER JUNCTION STUD BLOCK WAS MOUNTED TO THE ENGINE TUNNEL WITH A LARGER THAN SPECIFIED SCREW. THIS DID NOT ALLOW FOR ADEQUATE CLEARANCE BETWEEN THE SCREW HEAD AND THE RING TERMINALS WHICH ATTACH TO THE STUD. IF CONTACT SHOULD OCCUR, AN ELECTRICAL SHORT WILL RESULT AND POSSIBLY CAUSE A FIRE.
CORRECTION: CORRECT FASTENERS WHICH ARE RECESSED INTO THE MOUNTING BLOCK WILL BE INSTALLED.
Verify each fact at the issuing agency before acting. Recall scope, affected lots, and remediation instructions may be updated by the agency after our last sync.
ProductGuru indexes recall and safety-alert records from ~30 public agency registries. We are not lawyers, regulators or product-safety consultants. This page restates what the named agency published; consult the primary source above (or qualified counsel in your jurisdiction) before any commercial, medical or safety decision.